UrbanEarth EV Charging Station

Charge at home, safely and to the right load

AC home chargers, apartment and community charging points, and workplace stations — with load assessment, protection and clean cable routing.

  • Load and meter capacity checked first
  • Dedicated circuit with proper protection
  • Cable routing planned, not draped
180+
Projects delivered
12
Years in Bangalore
45+
In-house & vetted crews
96%
On-time handover
How we work

A predictable, documented process

Step 1

Requirement

Tell us the property, the problem and the timeline. We qualify it the same day.

Step 2

Site assessment

A supervisor visits, measures and photographs the actual condition.

Step 3

Proposal

Itemised scope, materials, rates and duration — in writing before work starts.

Step 4

Execution & completion

One accountable supervisor, daily site updates, snag list closed at handover.

Packages

Transparent starting prices

Every quote is line-itemed and fixed at signing. Final price depends on scope, materials, and site conditions.

Home charger

Single point

Starting from
On site assessment
  • Load assessment
  • Dedicated circuit and RCBO
  • Charger mounting and wiring
  • Testing and demo
Get a quote
Most popular

Multi-point / apartment

Most popular

Starting from
On site assessment
  • Multiple bays
  • Load management advice
  • Sub-metering option
  • Cable trays and labelling
Get a quote

Workplace / community

Larger sites

Starting from
On site assessment
  • Site layout and phasing
  • Higher-capacity chargers
  • Access and billing options
  • Handover documentation
Get a quote
Recent work

Case studies from the last 12 months

From our clients

Real words from real homeowners

Frequently asked

Straight answers, no jargon

Can my existing connection handle a charger?

Often yes for a 3.3–7.4 kW AC charger, but we check sanctioned load and the existing wiring before committing.

Which charger should I buy?

One matched to your vehicle's onboard charger and your overnight hours. A bigger charger doesn't always charge faster.

Do apartments need society approval?

Usually yes, plus a metering decision. We prepare the technical details you can take to the committee.

Can multiple cars share one supply?

Yes, with load management so the incoming supply isn't exceeded when both charge at once.

How long does installation take?

A single home point is often a day; multi-point installations depend on cable runs and metering.

Is the installation safe in the rain?

Outdoor points use weather-rated enclosures and correct earthing and protection. That's non-negotiable in our scope.

Ready to start with EV Charging Stations?

Speak to a specialist today — free consultation, no obligation. We reply within one business day.